Portion of Cagayan RiverLal-lo, Cagayan
DPWH logo Bagong Pilipinas logo
Republic of the PhilippinesDepartment of Public Works and Highways
Overview

Bureau of Equipment

Bureau of Equipment

What we will cover

8,804land-based units
307dredging and support equipment

Managed nationwide by the Bureau of Equipment

Who We Are

The Bureau of Equipment is an organization of

86regular positions

77 filled today9 still vacant

led by the Office of the Director, and organized into

3divisions

7Office of the Director
15Planning
41Operation & Maintenance
23Floating Equipment

and backed by

263contract of service workers,

most of whom are on field assignments.

231 of them work with the Floating Equipment Division, which runs our dredging fleet
23132
Floating Equipment DivisionOther offices

Also on the team: 27 CTI and 1 coterminous employee

Today, we work under the

Office of the Undersecretary for Technical Services and Operations

for External Convergence Projects.

We also helpOplan Kontra Baha Task Forcewith the Office of the Undersecretary for Special Concerns
Director Toribio Noel L. Ilao
Toribio Noel L. IlaoDirector
Assistant Director Hugh Van Erik Q. Tolentino
Hugh Van Erik Q. TolentinoAssistant Director
As of 29 October 2026 · BOE Employee Masterlist

Organizational Chart

86 authorized77 filled9 vacantScroll to see every section

Core Mandates

The Equipment Arm of the DPWH

A staff bureau mandated under , the BOE provides technical services on the management of all DPWH equipment assets nationwide.

01 Policy and Standards

Formulates policies, procedures and standards for fleet management and by-administration dredging program management.

02 Review and Evaluation

Reviews and evaluates programs, estimates, and tender and contract documents for equipment.

03 Planning and Programming

Prepares short- to long-term plans for fleet management and dredging using risk-based Asset Life Cycle Management, including the financial plan, capability development program and dredging master plan.

04 Assessment and Checking

Inspects, checks and monitors how Regional Offices and District Engineering Offices manage equipment, to make sure it follows current standards and policies.

05 Other Functions

Conducts Quick Response Operations during disasters and calamities.

Photo: BOE · Port Area, Manila  ·  EO No. 124 (1987): Reorganizing the Ministry of Public Works and Highways, redefining its powers and functions, and for other purposes.
Executive Order No. 124, s. 1987

Section 22 · Bureau of Equipment

Section 22 of Executive Order No. 124, s. 1987, Bureau of Equipment: the Bureau of Equipment is hereby reorganized to provide technical services on the management of construction and maintenance equipment and ancillary facilities, with duties (a) to (e): formulate policies; review and evaluate programs, estimates, and tender and contract documents for equipment; inspect, check, and monitor the management of equipment by regional equipment services and area shops; provide specialist support to implementing field offices on equipment management; and perform such other related duties as may be assigned by the Minister or required by law.
EO 124 (1987) reorganized what was then the Ministry of Public Works and Highways. “Ministry” and “Minister” now refer to the DPWH and its Secretary.

What the BOE is doing now

01 By-Administration Flood Control Dredging

Dredging projects using 307 DPWH-owned water- and land-based equipment in 17 regions.

02 Quick Response Operations

When disasters strike, Central Office quick response equipment is deployed to support the recovery of affected areas.

03 EVs and EV Charging Stations

In line with RA 11697 (Electric Vehicle Industry Development Act), the BOE supports EV fleet integration in the ROs and DEOs.

04 Central Office Motorpool

Maintenance and management of the Central Office service vehicles and equipment, so they stay safe and ready for official use.

05 Oplan Kontra Baha

A short-term government program of nationwide waterways clearing and cleaning operations, so floodwater has a clear path to flow.

06 River Basin Simulations

Simulations of the river basins to assess the effectivity of proposed dredging plans prior to resource allocation.

Three divisions, one fleet

  • Planning and Programming
  • Policy Making
  • Acquisition and Demand Management
  • Utilization, Cost Analysis, and Performance Monitoring and Evaluation
  • Work Programs and Budgetary Requirements Planning
  • Disposal
Engr. Wilfredo Arthur C. Delizo
Headed byWilfredo Arthur C. DelizoEngineer V · Chief, EPD
  • Land-based Equipment (LBE) Deployment and Operation
  • Fleet Maintenance Standards Planning, Inspection, and Monitoring
  • Central Office Motorpool Fleet Operations and Maintenance
  • Storage and Inventory Consumption and Monitoring
Engr. Virgilio G. Rañoa
Headed byVirgilio G. RañoaEngineer V · Chief, EOMD
  • By-administration Dredging Project Implementation
  • Water-based Equipment (WBE) Strategic Deployment
  • WBE Ownership Records and Inventory
  • Dredging Plan Evaluation
  • Bathymetric and Topographic Surveying
  • WBE Dry-docking and Repair Programming, Facilitation, Monitoring, and Evaluation
Engr. Francis L. Nuñez
Headed byFrancis L. NuñezEngineer IV · OIC, FED
Equipment Planning Division · 2 sections

EPD · Sections

EPD

Equipment Planning Division

Wilfredo Arthur C. Delizo
Headed byWilfredo Arthur C. DelizoEngineer V · Chief, EPD
PPS

Planning and Programming Section

UCAS

Utilization and Cost Analysis Section

EPD works through two sections; it has no separate units.DivisionSectionUnitSource: EPD Organizational Chart (QMS-9.1.1-01)
Equipment Operation and Maintenance Division · 2 sections · 6 units

EOMD · Sections and units

EOMD

Equipment Operation and Maintenance Division

Virgilio G. Rañoa
Headed byVirgilio G. RañoaEngineer V · Chief, EOMD
EMOSSS

Equipment Management and Operations Support Services Section

PCCSU
Parts and Consumable Control and Standards Unit
FRAU
Fleet Reliability and Assurance Unit
FPDGU
Fleet Performance and Data Governance Unit
CSGU
Capability, Standards and Governance Unit
EMMS

Equipment Management and Maintenance Section

MSSU
Maintenance Services and Supply Unit
AROU
Asset Readiness and Operations Unit
DivisionSectionUnitSource: BOE Office Order No. 18, s. 2026 (23 July 2026), Reorganization of Sections and Units in EOMD
Floating Equipment Division · 3 sections · 8 units

FED · Sections and units

FED

Floating Equipment Division

Francis L. Nuñez
Headed byFrancis L. NuñezEngineer IV · OIC, FED
PSS

Planning and Surveying Section

PIMU
Planning and Inventory Management Unit
SU
Survey Unit
PLU · Unit

Procurement and Logistics Unit

Directly under the division
DOSSS

Dredging Operations and Support Services Section

OSSU
Operations and Support Services Unit
PMU
Performance Management Unit
MDSS

Maintenance and Dry-Docking Services Section

DDU
Dry-Docking Unit
MU
Maintenance Unit
SCU
Safety and Compliance Unit
DivisionSectionUnitSource: FED organizational chart
DPWH Department Orders · 2014 to 2026

The policies we work by

30Department Orders
in force today

Rules issued by the DPWH Secretary that tell us how to plan, use, repair and protect the Department’s equipment and dredges.

1’14
3’15
10’16
–’17
3’18
2’19
3’20
–’21
3’22
3’23
–’24
1’25
1’26
Orders in force, by year issued

Keeping them current

5orders now being revised
4new guidelines being prepared
7older orders replaced since 2014

A Dredging Projects

5

How river dredging for flood control is planned, designed, approved and given permits, and who signs off.

The orders
13920147201631202019120221532023

B Fleet Management

10

How equipment is assigned, recorded, turned over, counted and kept for DPWH use only.

The orders
63201664201611820161342016165201617920165320182320201012025632026

C Maintenance and Repair

7

How equipment and dredges are checked, serviced, dry-docked and repaired, and how repairs are paid for.

The orders
11201652018820191262019122020272022312023

D Safety and Readiness

8

Keeps crews safe and dredges fit, readies the fleet for typhoons and earthquakes, and pushes for better performance.

The orders
742015136201516220151202016196201687201823420221132023
Source: BOE index of equipment and dredging Department Orders and copies on file, 2014 onwards. Replaced orders are not counted. Orange tag = being revised
Our Department Orders · 1 of 2

Dredging and fleet management

A Dredging Projects

5 orders
DO139s. 2014
Flood-Control Dredging Standards

Sets the surveys, soil tests, clearances and plans every flood-control dredging project must have.

DO7s. 2016
Dredging by Administration

Guidebook for planning, permitting, running and monitoring dredging done by DPWH’s own crews.

DO31s. 2020
Dredging Clearances and Permits

Lets the Regional Directors, instead of the Secretary, approve dredging clearances and permits.

DO191s. 2022
Signing of Dredging Plans

Lets the Undersecretary for Technical Services approve and sign flood-control dredging plans.

DO153s. 2023
Approval of Dredging Designs

Sets who reviews and approves detailed design plans for dredging, based on each office’s design rating.

B Fleet Management

10 orders
DO63s. 2016
Land-based Equipment Management

One set-up for managing equipment in the ROs and DEOs, and who does what, to cut repair downtime.

DO64s. 2016
Highway Maintenance Equipment

How highway maintenance equipment is assigned, funded, maintained and monitored.

DO118s. 2016
No Leasing Policy

DPWH equipment may not be rented out to others.

DO134s. 2016
Equipment Data and Reports

Standard equipment records and monthly performance reports sent to the BOE.

DO165s. 2016
Turn-over of Project Equipment

Handover of units from civil works projects; each needs a BOE property code before use.

DO179s. 2016
Idle and Non-operational Dredges

What to do with crews and dredges that are broken, suspended or waiting for work.

DO53s. 2018
Yearly Property Inventory

Inventory committees count all DPWH property every year.

DO23s. 2020
Timely Withdrawal of New Units

New equipment must be picked up from storage within 60 days, or the BOE re-allocates it.

DO101s. 2025
Equipment Services under NIR

Moves the Negros Oriental and Bacolod equipment services under the Negros Island Region.

DO63s. 2026
Donated Equipment for Marawi

Rules for 75 donated heavy equipment from Japan and China; the BOE supervises, Region X keeps them.

Orange number = being revised  ·  DO 7 s. 2016 adds to DO 139 s. 2014. The Regional Directors’ permit power under DO 31 s. 2020 stays in force.
Our Department Orders · 2 of 2

Maintenance, safety and readiness

C Maintenance and Repair

7 orders
DO11s. 2016
Routine Maintenance Manual

Daily checks that keep service vehicles and common equipment road-worthy.

DO5s. 2018
Preventive Maintenance Manual

Service schedules from every 50 hours or 1,000 km (PM1) up to every 1,000 hours or 20,000 km (PM4).

DO8s. 2019
Dry Docking of Dredges

Dredges and vessels are dry-docked twice every five years at accredited shipyards.

DO126s. 2019
Reimbursement of Repairs

Rules and limits for paying back emergency and preventive repairs, from ₱5,000 to ₱30,000 per unit.

DO12s. 2020
Calibration of Survey Tools

Regular checking and registration of survey tools such as GNSS, total stations and drones.

DO27s. 2022
Dredge Preventive Maintenance

Preventive maintenance of all DPWH dredges and other water-based equipment.

DO31s. 2023
Dredge Corrective Maintenance

How dredge breakdowns are inspected, funded and repaired; repairs may not cost over 30% of the market price.

New
Coming next
  • Parts Management Guidelines
  • Certification of Base and Area Shops
  • QRA Readiness Protocol
  • FDMA Guidelines

D Safety and Readiness

8 orders
DO74s. 2015
Safety on Board Dredges

Safety manual for all DPWH dredges; everyone on site is briefed and signs it before work.

DO136s. 2015
Heavy Weather Positioning

Moving dredges to safe shelter during storms to protect crews and equipment.

DO162s. 2015
Hot Work and Lock-out/Tag-out

Safety rules for welding and repairs; hot work needs a signed one-day permit.

DO120s. 2016
Certificate of Fitness

Dredges and vessels must pass inspection to get a BOE fitness certificate.

DO196s. 2016
Best Dredge and Dredge Master

A yearly ranking that honors the top three dredges and their crews.

DO87s. 2018
“Big One” Earthquake Plan

Pre-positions Quick Response equipment and sends it in waves after a major quake.

DO234s. 2022
Energy Efficiency and Conservation

Puts RA 11285, the Energy Efficiency and Conservation Act, into practice in the DPWH.

DO113s. 2023
PSRRRP in Emergency Response

Brings the PSRRRP equipment into the DPWH Emergency Preparedness and Response Program.

Orange number = being revised  ·  DO 126 s. 2019 amends DO 123 s. 2015. DO 234 s. 2022 and DO 113 s. 2023 are from the BOE index; their copies are not yet in the shared folder.

Land-based Equipment Fleet

We monitor every unit

The BOE tracks the status of all DPWH land-based and water-based equipment. The land-based fleet is the motor vehicles and heavy equipment used for highway maintenance and quick response.

94%Operational
8,300Operational
504Non-operational
Total8,804units
Equipment types

Service Vehicle (H1)

Stake / Boom Truck (H2)

Dump Truck (H3)

Water Tank Truck (H6)

Hydraulic Excavator, Track (F16)

Hydraulic Excavator, Wheel (F17)

Wheel Loader (L2)

Backhoe Loader (LX)

Road Grader (N1)

Vibratory Roller (Z18)

Other specialized equipmentTelescopic handler, street sweeper, milling machine, sewer jet cleaner, bulldozer, forklift, bridge inspection equipment, and more
As of July 2026

Land-based fleet by type and office

Land-based Equipment Fleet (LEF)
2,436+174 vs Jun '25
2,303 operational 133 non-op
Service Vehicle Fleet (SVF)
5,403+233 vs Jun '25
5,120 operational 283 non-op
Others
965+105 vs Jun '25
877 operational 88 non-op
Grand total
8,804+512 vs Jun '25
8,300 operational · 504 non-op
Distribution by status, per office
OperationalNon-operational

DPWH dredging fleet composition

307
dredging and support equipment
Water-basedLand-based

Dredging fleet per region

307 equipment per region
Main dredging · 221Support · 86
307 equipment
Water-based | Land-based

221 Dredging equipment

  • Amphibious Excavator (AE)123
  • Multipurpose Amphibious Dredge (MPAD)57
  • Cutter Suction Dredge (CSD)17
  • Backhoe on Barge (BOB)5
  • Trash Skimmer (TS)3
  • Main Dredging Land-based Equipment (LBE)16

86 Support equipment

  • Support Vessel19
  • Support Land-based Equipment (LBE)67

Main dredging equipment status per region

221 main dredging equipment
IdleOperationalMaintenance
34.39%
Operational · 76 units
30.77%
Idle · 68 units
Why?
34.84%
Maintenance · 77 units
Why?
By-administration dredging

Dredging by-administration timeline

2014
Start of by-administration dredging
40 dredging projects
2016
Start of MOOE allocation for by-administration dredging: ₱215,366,000.00
57 dredging projects
2019
Manila Bay Clean-up · GAA MOOE = proposed MOOE
70 dredging projects
2020
GAA MOOE ₱915.0M, the full 100% of proposed
2021
Start of BBB projects: Cagayan, Bicol and Pasig-Marikina · GAA MOOE ₱430.0M, only 43% of proposed
96 dredging projects
2022
GAA MOOE ₱100.0M, only 4.16% of proposed
97 dredging projects
2023
GAA MOOE ₱467.1M, only 21.62% of proposed
116 dredging projects
2024
GAA MOOE ₱434.4M, only 20.15% of proposed
122 dredging projects
2025
GAA MOOE ₱439.9M, only 15.14% of proposed
134 dredging projects
2026
GAA MOOE ₱1.34B, still only 35.15% of proposed
By-administration dredging

Dredging at the river basins

18 Major river basins

38dredging projects
103dredging & support equipment

Principal river basins

33dredging projects
64dredging & support equipment

In all: 71 dredging projects with 167 dredging and support equipment deployed.

Dredging equipment assigned
All major river basins
0units
The 18 major river basins Click one, or type its number (0 = all)
Click a basin or type its number · drag · scroll to zoom
DPWH logo
IBRD Loan No. 9251-PH

Philippines Seismic Risk Reduction and Resilience Project

International Bank for Reconstruction and Development (IBRD)
World Bank logo
Project development objectives

What the project aims to enhance

Safer public buildings

Seismic resilience of selected public buildings in Metro Manila

A readier DPWH

Stronger capacity to prepare for and respond to emergencies

PSRRRP Component 2

Improving Emergency Preparedness and Response in Public Works

159units of mission-essential equipment
  • Transport & mobilityRestore roads and access after a disaster
  • CommunicationKeep field teams connected
  • Capacity buildingTrain the Department to prepare and respond
  • Small to big disastersFrom yearly events to rare, high-impact ones
  • Multiple hazardsClimate-related disasters and public health
  • Oplan Metro Yakal PlusAnd other national emergency response plans
ROAD BLOCKED ROAD OPEN OPLAN METRO YAKAL PLUS Teams deployed✓ Comms restored✓ Roads cleared SEISMIC ALERTM7.2
PSRRRP · Component 2

Emergency response equipment

Click any photo to browse the lots
Lot01
PSRRRP equipment · 1 of 14

Backhoe Loader

Scroll or use the arrow keys to browseClick outside the photos to go back
PSRRRP · Component 2

Where the equipment is stationed

Bulacan 3rd DEOSan Rafael, Bulacan
18
Laguna 2nd DEOLos Baños, Laguna
33
Batangas 3rd DEOTanauan, Batangas
20
BOE Bicutan & PCG Base FarolaTaguig and San Nicolas, Manila
53
EquipmentBulacan 3rd DEOLaguna 2nd DEOBatangas 3rd DEOBicutan / FarolaTotal
Backhoe Loader363214
Hydraulic Excavator, Crawler Type373316
Prime Mover w/ Low-bed Trailer, 50 tons11114
Prime Mover w/ Low-bed Trailer, 75 tons00022
Stake Truck w/ Boom242210
Water Tank Truck12126
Tow Truck12126
Dump Truck374216
Bulldozer0011516
Fuel Tank Truck12126
Wheel Loader00178
Road Grader10078
Mobile Shop Truck11158
All Terrain Crane11114
Total18332053124
EV integration · executive summary

Why the BOE is going electric

The law we are complying with

Republic Act No. 11697

Electric Vehicle Industry Development Act (EVIDA) · lapsed into law on April 15, 2022

Its declared policy (Sec. 2): reduce the country's reliance on imported fuel for transport, and promote cleaner, low-emission vehicles.
5%of the fleet
Section 16

Government fleets must go EV

National agencies, GOCCs and LGUs must make at least 5% of their fleet, owned or leased, electric, on the CREVI timeline: by 2034, per the DOE.

PBBM target (Apr 2024): 10% of government vehiclesSONA 2026: prioritize EVs in re-fleeting
DPWH task
Section 12

DPWH writes the charging rules

The DPWH must set guidelines for installing charging stations in buildings and other establishments.

✓ Started: DO 135 & DO 136, s. 2025 (charger specs and EVCS guidelines)
5%of parking
Section 17

EV parking in buildings

New public and private buildings with 20 or more parking slots must set aside at least 5% for EVs.

EV a vehicle run fully or partly on electricityEVCS EV charging stationCREVI the national EV roadmap that sets the deadlines
How we got here
  1. The law sets the target

    EVIDA requires every government agency, the DPWH included, to electrify at least 5% of its fleet.

  2. DPWH has a double role

    It must comply as an agency with a large fleet, and lead as the agency that writes the charging station guidelines.

  3. The BOE takes it on

    As the equipment arm managing all DPWH equipment assets, the BOE plans the EV fleet: 103 electric and hybrid vehicles endorsed to DBM for 2024 and 95 for 2025.

  4. EVs need places to charge

    So the BOE built the charging program: DO 135 and DO 136, s. 2025, and ₱300 million for 300 charger sets in 18 offices.

  5. The payoff

    Less fuel bought, cleaner air around our offices, and a DPWH fleet ready for the EVIDA deadlines.

EV integration

Electric vehicle roadmap

1st Q 2025

Research and Preparation

Policy research, technical validation and preparatory consultations to lay the foundation of the Electric Vehicle Charging Equipment (EVCE) Program.

2nd Q 2025

Issuance of Policies

DO No. 135, s. 2025: DPWH Standard Specification for Item 1112, Electric Vehicle Charging Equipment.
DO No. 136, s. 2025: Guidelines for the Construction of EV Charging Stations (EVCS).

3rd Q 2025

Fund Distribution

₱300 million released for distribution to all DPWH Regional Offices, approved through a memorandum dated August 1, 2025.

4th Q 2025 onwards

Project Implementation

Regional Offices start EVCS construction: procurement, site preparation, and compliance monitoring under the issued guidelines.

EV integration

Three types of charging equipment

Direct current

60 kW

162sets
Max. current
200 A
Min. rated power
60 kW
Voltage range
200 V – 1,000 V
Input voltage
400 V ± 15%, 3 phase / 60 Hz
Connector
CCS Combo 2
Compatibility
EVs with the same charging protocols
Alternating current

22 kW

18sets
Max. current
32 A
Min. rated power
22 kW
Input voltage
400 V ± 10%, 3 phase / 60 Hz
Connector
Type 2
Compatibility
Type 2 to GB/T AC adapter; Type 2 to CCS2 (EV inlet) for AC charging
Alternating current

7 kW

120sets
Max. current
32 A
Min. rated power
7 kW
Input voltage
230 V ± 10%, 1 phase / 60 Hz
Connector
Type 2
Compatibility
Type 2 to GB/T AC adapter; Type 2 to CCS2 (EV inlet) for AC charging
300charging sets in all
₱300Mtotal cost
18DPWH offices covered
EV integration

Charging sets per office

300 sets · ₱300 million
DC 60 kWAC 22 kWAC 7 kW
Central Office and NCR share one allocation of ₱18.9 million.
EV integration · as of June 2025

EVs endorsed to DBM

CY 2024103units endorsed
CY 202595units endorsed
HEV hybridPHEV plug-in hybridBEV battery electric
Section

Other Endeavors of the Bureau of Equipment

Beyond our regular programs, the BOE fleet and crews step in when the country needs them.

4endeavors
2019

Manila Bay Rehabilitation

Mechanized cleanup of the bay

2020

Taal Volcano Eruption

Clearing ash so help could come in

2026

Malabon–Navotas Landfill Fire

Covering the fire with soil

Since 2019

Free Bus Rides

Health workers, ASEAN delegates and stranded commuters

Other endeavors of the Bureau of Equipment

Manila Bay Rehabilitation 2019

DENR logoDPWH logoMMDA logo
The "Battle for Manila Bay"

Launched on January 27, 2019 to clean up the bay, with the DENR leading the agencies the Supreme Court tasked to restore it. The DPWH, through the BOE, ran the mechanized cleanup using its own equipment.

28heavy equipment units deployedamphibious excavators, dump trucks and a debris segregator
1.5 kmof shoreline cleanedManila Yacht Club to the U.S. Embassy
225,000m³ of silt and garbagetargeted for removal
16hrsof work a daysix days a week, plus a night shift to haul to the landfill
Jan 27, 2019Cleanup launched
Mar 5, 2019DPWH dredging starts
Mar 2019Night shift added
Other endeavors of the Bureau of Equipment

Taal Volcano Eruption Response 2020

What happened

Taal Volcano erupted on January 12, 2020. Alert Level 4 was raised that night, and thick ash buried the roads of Batangas and Cavite. Under Oplan Taal, the DPWH sent in its equipment and crews.

4Alert Level
raised by PHIVOLCS
70,413people in
evacuation centers
How we responded

Graders scraped ash and debris off the roads to make room so public services could come in

Dump and stake trucks carried residents out of the danger zone

DPWH crews shoveled ash so ambulances and relief trucks could pass

Other endeavors of the Bureau of Equipment

Malabon–Navotas Landfill Fire 2026

What happened

On April 10, 2026, a fire broke out at the Navotas sanitary landfill. Its smoke made the air hazardous across Metro Manila and Bulacan. On the President's instruction, the DPWH sent in its heavy equipment to cover the fire with soil.

30days until the fire
was declared out
28.6haburned, about
71% of the landfill
How we covered the fire

Dump trucks haul in soil and sand

Bulldozers and excavators spread it over burning sections, level by level

The soil cuts off oxygen, so the fire dies out

Apr 10Fire breaks out
Apr 12Declared under control by the BFP
Apr 16DPWH equipment deployed
Apr 29About half covered
May 6About 80% contained
May 10Fire fully out
Other endeavors of the Bureau of Equipment

Free bus rides when people needed them most

2019
30th Southeast Asian Games

For ASEAN delegates

When the Philippines hosted the 2019 SEA Games, led by Alan Peter Cayetano's organizing committee, our buses ferried athletes and delegates from across ASEAN.

2020
COVID-19 pandemic

For hospital workers

When public transport stopped during the lockdown, the DPWH Free Bus Ride Program took health workers to and from their hospitals at no cost.

Strike days
Jeepney transport strikes

For stranded commuters

When jeepney drivers went on strike, our buses gave free rides to the riding public left without a way to get to work or school.

Regular days
Everyday shuttle service

For DPWH employees

On regular working days, our buses provide transportation for employees within NCR, to and from the office.

When regular transport cannot run, the BOE fleet steps in so people can still get where they need to go.

Organizational challenges

Human resource challenges

  • No hazard payOur 263 job order workers carry the risk without the pay
  • Same plantilla, more work86 positions while projects grew from 40 to 134 a year
  • Hiring bansPositions stay unfilled though equipment works all year
  • Skills that walk awayShort contracts: trained operators leave

Limited resources

  • Not enough to runAbout ₱1.81M per unit a year, for everything
  • Repairs come firstOnly about a fifth of maintenance is preventive
  • Units waiting on funds46 of 68 idle units wait for funds or procurement
  • After disastersRecovery work stretches the funds even more
Human resource challenges

No hazard pay for job order workers

Hazard pay? PAYSLIP · JOB ORDER Daily wage✓ Overtimeas worked Hazard pay₱0.00 Floods
Hazard pay? PAYSLIP · OPERATOR Daily wage✓ Field worklandslide area Hazard pay₱0.00 Landslides on mountain roads
263contract-of-service and job order workers carry most of the Bureau's field work
Floods, landslides & disaster zonesare where they operate our equipment
₱0hazard pay on their payslip for that risk
Human resource challenges

More work, the same people

By-administration dredging projects per year
402014572016702019962021972022116202312220241342025Plantilla: 86

Bigger fleet, same plantilla

The fleet and the yearly dredging program keep growing, but the plantilla stays at 86 positions. Most of the work falls on contract workers.

Hiring bans, nonstop deployment

Bans on hiring stop us from filling positions, even though our equipment is deployed all year round.

Skills that walk away

Short contracts mean trained operators leave, and it takes years to build the skills these machines need.

134projects in 2025, 3.4× the 40 in 2014
86authorized plantilla positions for the whole Bureau
263contract-of-service and job order workers fill the gap
Limited resources

Where a dredging peso goes

Where it starts

Dredging fund

The yearly budget (MOOE) for by-administration dredging

Maintenance

Keeps the equipment working

Operation

Makes the equipment dredge

Preventive

Scheduled care: oil, filters, greasing and inspections, so parts don't break

Corrective (repairs)

Fixing what already broke: engines, pumps, pontoons and parts

Fuel

Diesel for the engines and pumps; the biggest running cost of a dredger

Labor

Operators, mechanics and crew who run the machines every day

Dredging MOOE (example)₱400Mfor all by-administration dredging
÷ 17 regions₱23.5Mper region per year
÷ 221 dredging units₱1.81Mper unit per year, for everything

Maintenance

about 40% · ₱0.72M per unit
Preventive · about 20%₱0.14M

Oil changes, filters, greasing, inspections

Corrective (repairs) · about 80%₱0.58M

Breakdowns, engine and pontoon repairs, parts

₱0 on repairs49%
Repairs (CM)₱0.58M
Left for operation₱1.09M

Operation

about 60% · ₱1.09M per unit
5.5months of dredging
out of a 10-month season
Salaries · 12 months₱0
Left for fuel₱1.09M
Fuel per month₱0.20M
In plain words

Every dredging peso is split two ways: one part keeps the machines working, the other makes them dredge. If repairs eat the budget first, there is little left for fuel and crew.

The result

Almost nothing goes to operation

A full 10-month season of fuel alone (₱1.99M) costs more than a unit’s whole yearly share (₱1.81M). Units sit idle, waiting for fuel, repairs or both.

Resiltation

Silt flows back every rainy season, so the same rivers must be dredged again each year.

Bureaucratic delays

Buying fuel and spare parts takes months, which shortens the working season even more.

Example only. Ratios: fuel ≈30% and repairs ≈20% of dredging costs (Bray et al.); preventive ≈10–30% of maintenance (TRB). Fuel: about 16 L/hr for a 20–22 t amphibious excavator digging at high load (amphibious 21–25 t carrier spec: 16–18 L/hr; 20 t excavators: 12–19 L/hr) × 6 hrs a day × 22 days = 132 hrs a month; diesel at the Oct 2026 common price (₱94.40/L). Pay per worker is an example; adjust the sliders.
Limited resources

Our yearly dredging budget, in context

By-administration dredging budget per year
₱400M example
₱33.3M2018
₱215.0M2019
₱915.0M2020
₱430.0M2021
₱100.0M2022
₱467.1M2023
₱434.4M2024
₱439.9M2025
₱1.34B2026

In the last three full years, the dredging budget stayed between ₱434M and ₱467M, close to the ₱400M example.

DPWH flood control fund vs our dredging budget
2024
Flood control₱244.5B
Dredging₱434.4M
Share0.18%
2025
Flood control₱254.3B
Dredging₱439.9M
Share0.17%
Less than ₱2of every ₱1,000 for flood control went to by-administration dredging
DredgingRest of the flood control fund
Flood control: DPWH Flood Management Program, 2024 and 2025 (DPWH data via SunStar, July 2025). Counting all sources, Sen. Lacson cites ₱346.8B (2024) and ₱372.8B (2025), which makes the dredging share even smaller.

How we move forward

MOTORPOOL DOWN READY PARTS ₱ Back to work!
01Higher productivity

Stronger equipment repair

Enough funds, spare parts and mechanics for repairs, so broken units get back to work sooner.

  • Fast-track repair of our 504 non‑operational units
  • A dedicated repair fund and parts stock per region
  • Preventive maintenance so small faults never become breakdowns
FLEET DASHBOARD Engine hrs6.2 Fuel72% AI Check pump soon✓ Reviewed by engineer
02Smarter decisions

Digitalization, telematics & ethical AI

Know where every unit is, how it is running and what it needs, with AI that is used responsibly.

  • One digital database for fleet records, replacing paper forms
  • Telematics: trackers that report location, engine hours and fuel
  • Ethical AI spots breakdowns early, with human review and data privacy
TESDA Salamat po! PAYSLIP · JOB ORDER Daily wage✓ Insurance✓ Hazard payPAID ✓
03Fair & safe work

Support for our people

Support our operators, mechanics and crews through ethical labor practices: fair pay, safe work, fair treatment.

  • Hazard pay and benefits, including our 263 job order workers
  • Safety gear, insurance and reasonable hours in the field
  • Training and certification with TESDA and other agencies
PAGASA BULLETIN Typhoon in 48 hrsMove equipment now LGU
04Wider reach

Stronger collaboration

Work closely with sectoral partners: other agencies, LGUs, the private sector and academe.

  • PAGASA and weather agencies: deploy before storms hit
  • Joint disaster response with LGUs, OCD and BFP, as in Taal and Navotas
  • Shared data and resources with academe and industry through MOAs

The Management of the Bureau of Equipment

DPWH logo

Bureau of Equipment

2nd Street, Port Area, Manila

(02) 5304-3698

Toribio Noel L. Ilao
Toribio Noel L. IlaoDirector IV0998-950-6560
Hugh Van Erik Q. Tolentino
Hugh Van Erik Q. TolentinoDirector III0915-324-9763
Wilfredo Arthur C. Delizo
Wilfredo Arthur C. DelizoEngineer V · Chief, EPD0960-456-3170
Virgilio G. Rañoa
Virgilio G. RañoaEngineer V · Chief, EOMD0916-902-3959
Francis L. Nuñez
Francis L. NuñezEngineer IV · OIC, FED0977-255-0240
The End

Thank You! Salamat po!

Bureau of Equipment · Department of Public Works and Highways

1 / 32