Republic of the PhilippinesDepartment of Public Works and Highways
Overview
Bureau of Equipment
Bureau of Equipment
What we will cover
8,804land-based units
307dredging and support equipment
Managed nationwide by the Bureau of Equipment
Who We Are
The Bureau of Equipment is an organization of
86regular positions
77 filled today9 still vacant
led by the Office of the Director, and organized into
3divisions
7Office of the Director
15Planning
41Operation & Maintenance
23Floating Equipment
and backed by
263contract of service workers,
most of whom are on field assignments.
231 of them work with the Floating Equipment Division, which runs our dredging fleet
23132
Floating Equipment DivisionOther offices
Also on the team: 27 CTI and 1 coterminous employee
Today, we work under the
Office of the Undersecretary for Technical Services and Operations
for External Convergence Projects.
We also helpOplan Kontra Baha Task Forcewith the Office of the Undersecretary for Special Concerns
Toribio Noel L. IlaoDirector
Hugh Van Erik Q. TolentinoAssistant Director
As of 29 October 2026 · BOE Employee Masterlist
Organizational Chart
86 authorized77 filled9 vacantScroll to see every section
Core Mandates
The Equipment Arm of the DPWH
A staff bureau mandated under , the BOE provides technical services on the management of all DPWH equipment assets nationwide.
01 Policy and Standards
Formulates policies, procedures and standards for fleet management and by-administration dredging program management.
02 Review and Evaluation
Reviews and evaluates programs, estimates, and tender and contract documents for equipment.
03 Planning and Programming
Prepares short- to long-term plans for fleet management and dredging using risk-based Asset Life Cycle Management, including the financial plan, capability development program and dredging master plan.
04 Assessment and Checking
Inspects, checks and monitors how Regional Offices and District Engineering Offices manage equipment, to make sure it follows current standards and policies.
05 Other Functions
Conducts Quick Response Operations during disasters and calamities.
Photo: BOE · Port Area, Manila · EO No. 124 (1987): Reorganizing the Ministry of Public Works and Highways, redefining its powers and functions, and for other purposes.
Executive Order No. 124, s. 1987
Section 22 · Bureau of Equipment
EO 124 (1987) reorganized what was then the Ministry of Public Works and Highways. “Ministry” and “Minister” now refer to the DPWH and its Secretary.
What the BOE is doing now
01 By-Administration Flood Control Dredging
Dredging projects using 307 DPWH-owned water- and land-based equipment in 17 regions.
02 Quick Response Operations
When disasters strike, Central Office quick response equipment is deployed to support the recovery of affected areas.
03 EVs and EV Charging Stations
In line with RA 11697 (Electric Vehicle Industry Development Act), the BOE supports EV fleet integration in the ROs and DEOs.
04 Central Office Motorpool
Maintenance and management of the Central Office service vehicles and equipment, so they stay safe and ready for official use.
05 Oplan Kontra Baha
A short-term government program of nationwide waterways clearing and cleaning operations, so floodwater has a clear path to flow.
06 River Basin Simulations
Simulations of the river basins to assess the effectivity of proposed dredging plans prior to resource allocation.
Three divisions, one fleet
EPD
Equipment Planning Division
Planning and Programming
Policy Making
Acquisition and Demand Management
Utilization, Cost Analysis, and Performance Monitoring and Evaluation
Work Programs and Budgetary Requirements Planning
Disposal
Headed byWilfredo Arthur C. DelizoEngineer V · Chief, EPD
EOMD
Equipment Operation and Maintenance Division
Land-based Equipment (LBE) Deployment and Operation
Fleet Maintenance Standards Planning, Inspection, and Monitoring
Central Office Motorpool Fleet Operations and Maintenance
Storage and Inventory Consumption and Monitoring
Headed byVirgilio G. RañoaEngineer V · Chief, EOMD
FED
Floating Equipment Division
By-administration Dredging Project Implementation
Water-based Equipment (WBE) Strategic Deployment
WBE Ownership Records and Inventory
Dredging Plan Evaluation
Bathymetric and Topographic Surveying
WBE Dry-docking and Repair Programming, Facilitation, Monitoring, and Evaluation
Headed byFrancis L. NuñezEngineer IV · OIC, FED
Equipment Planning Division · 2 sections
EPD · Sections
EPD
Equipment Planning Division
Headed byWilfredo Arthur C. DelizoEngineer V · Chief, EPD
PPS
Planning and Programming Section
UCAS
Utilization and Cost Analysis Section
EPD works through two sections; it has no separate units.DivisionSectionUnitSource: EPD Organizational Chart (QMS-9.1.1-01)
Equipment Operation and Maintenance Division · 2 sections · 6 units
EOMD · Sections and units
EOMD
Equipment Operation and Maintenance Division
Headed byVirgilio G. RañoaEngineer V · Chief, EOMD
EMOSSS
Equipment Management and Operations Support Services Section
PCCSU
Parts and Consumable Control and Standards Unit
FRAU
Fleet Reliability and Assurance Unit
FPDGU
Fleet Performance and Data Governance Unit
CSGU
Capability, Standards and Governance Unit
EMMS
Equipment Management and Maintenance Section
MSSU
Maintenance Services and Supply Unit
AROU
Asset Readiness and Operations Unit
DivisionSectionUnitSource: BOE Office Order No. 18, s. 2026 (23 July 2026), Reorganization of Sections and Units in EOMD
Floating Equipment Division · 3 sections · 8 units
Source: BOE index of equipment and dredging Department Orders and copies on file, 2014 onwards. Replaced orders are not counted. Orange tag = being revised
Our Department Orders · 1 of 2
Dredging and fleet management
A Dredging Projects
5 orders
DO139s. 2014
Flood-Control Dredging Standards
Sets the surveys, soil tests, clearances and plans every flood-control dredging project must have.
DO7s. 2016
Dredging by Administration
Guidebook for planning, permitting, running and monitoring dredging done by DPWH’s own crews.
DO31s. 2020
Dredging Clearances and Permits
Lets the Regional Directors, instead of the Secretary, approve dredging clearances and permits.
DO191s. 2022
Signing of Dredging Plans
Lets the Undersecretary for Technical Services approve and sign flood-control dredging plans.
DO153s. 2023
Approval of Dredging Designs
Sets who reviews and approves detailed design plans for dredging, based on each office’s design rating.
B Fleet Management
10 orders
DO63s. 2016
Land-based Equipment Management
One set-up for managing equipment in the ROs and DEOs, and who does what, to cut repair downtime.
DO64s. 2016
Highway Maintenance Equipment
How highway maintenance equipment is assigned, funded, maintained and monitored.
DO118s. 2016
No Leasing Policy
DPWH equipment may not be rented out to others.
DO134s. 2016
Equipment Data and Reports
Standard equipment records and monthly performance reports sent to the BOE.
DO165s. 2016
Turn-over of Project Equipment
Handover of units from civil works projects; each needs a BOE property code before use.
DO179s. 2016
Idle and Non-operational Dredges
What to do with crews and dredges that are broken, suspended or waiting for work.
DO53s. 2018
Yearly Property Inventory
Inventory committees count all DPWH property every year.
DO23s. 2020
Timely Withdrawal of New Units
New equipment must be picked up from storage within 60 days, or the BOE re-allocates it.
DO101s. 2025
Equipment Services under NIR
Moves the Negros Oriental and Bacolod equipment services under the Negros Island Region.
DO63s. 2026
Donated Equipment for Marawi
Rules for 75 donated heavy equipment from Japan and China; the BOE supervises, Region X keeps them.
Orange number = being revised · DO 7 s. 2016 adds to DO 139 s. 2014. The Regional Directors’ permit power under DO 31 s. 2020 stays in force.
Our Department Orders · 2 of 2
Maintenance, safety and readiness
C Maintenance and Repair
7 orders
DO11s. 2016
Routine Maintenance Manual
Daily checks that keep service vehicles and common equipment road-worthy.
DO5s. 2018
Preventive Maintenance Manual
Service schedules from every 50 hours or 1,000 km (PM1) up to every 1,000 hours or 20,000 km (PM4).
DO8s. 2019
Dry Docking of Dredges
Dredges and vessels are dry-docked twice every five years at accredited shipyards.
DO126s. 2019
Reimbursement of Repairs
Rules and limits for paying back emergency and preventive repairs, from ₱5,000 to ₱30,000 per unit.
DO12s. 2020
Calibration of Survey Tools
Regular checking and registration of survey tools such as GNSS, total stations and drones.
DO27s. 2022
Dredge Preventive Maintenance
Preventive maintenance of all DPWH dredges and other water-based equipment.
DO31s. 2023
Dredge Corrective Maintenance
How dredge breakdowns are inspected, funded and repaired; repairs may not cost over 30% of the market price.
New
Coming next
Parts Management Guidelines
Certification of Base and Area Shops
QRA Readiness Protocol
FDMA Guidelines
D Safety and Readiness
8 orders
DO74s. 2015
Safety on Board Dredges
Safety manual for all DPWH dredges; everyone on site is briefed and signs it before work.
DO136s. 2015
Heavy Weather Positioning
Moving dredges to safe shelter during storms to protect crews and equipment.
DO162s. 2015
Hot Work and Lock-out/Tag-out
Safety rules for welding and repairs; hot work needs a signed one-day permit.
DO120s. 2016
Certificate of Fitness
Dredges and vessels must pass inspection to get a BOE fitness certificate.
DO196s. 2016
Best Dredge and Dredge Master
A yearly ranking that honors the top three dredges and their crews.
DO87s. 2018
“Big One” Earthquake Plan
Pre-positions Quick Response equipment and sends it in waves after a major quake.
DO234s. 2022
Energy Efficiency and Conservation
Puts RA 11285, the Energy Efficiency and Conservation Act, into practice in the DPWH.
DO113s. 2023
PSRRRP in Emergency Response
Brings the PSRRRP equipment into the DPWH Emergency Preparedness and Response Program.
Orange number = being revised · DO 126 s. 2019 amends DO 123 s. 2015. DO 234 s. 2022 and DO 113 s. 2023 are from the BOE index; their copies are not yet in the shared folder.
Land-based Equipment Fleet
We monitor every unit
The BOE tracks the status of all DPWH land-based and water-based equipment. The land-based fleet is the motor vehicles and heavy equipment used for highway maintenance and quick response.
94%Operational
8,300Operational
504Non-operational
Total8,804units
Equipment types
Service Vehicle (H1)
Stake / Boom Truck (H2)
Dump Truck (H3)
Water Tank Truck (H6)
Hydraulic Excavator, Track (F16)
Hydraulic Excavator, Wheel (F17)
Wheel Loader (L2)
Backhoe Loader (LX)
Road Grader (N1)
Vibratory Roller (Z18)
Other specialized equipmentTelescopic handler, street sweeper, milling machine, sewer jet cleaner, bulldozer, forklift, bridge inspection equipment, and more
As of July 2026
Land-based fleet by type and office
Land-based Equipment Fleet (LEF)
2,436+174 vs Jun '25
2,303 operational 133 non-op
Service Vehicle Fleet (SVF)
5,403+233 vs Jun '25
5,120 operational 283 non-op
Others
965+105 vs Jun '25
877 operational 88 non-op
Grand total
8,804+512 vs Jun '25
8,300 operational · 504 non-op
Distribution by status, per office
OperationalNon-operational
DPWH dredging fleet composition
307
dredging and support equipment
Water-basedLand-based
Dredging fleet per region
307 equipment per region
Main dredging · 221Support · 86
307 equipment
Water-based | Land-based
221 Dredging equipment
Amphibious Excavator (AE)123
Multipurpose Amphibious Dredge (MPAD)57
Cutter Suction Dredge (CSD)17
Backhoe on Barge (BOB)5
Trash Skimmer (TS)3
Main Dredging Land-based Equipment (LBE)16
86 Support equipment
Support Vessel19
Support Land-based Equipment (LBE)67
Main dredging equipment status per region
221 main dredging equipment
IdleOperationalMaintenance
34.39%
Operational · 76 units
30.77%
Idle · 68 units
Why?
34.84%
Maintenance · 77 units
Why?
By-administration dredging
Dredging by-administration timeline
2014
Start of by-administration dredging
40 dredging projects
2016
Start of MOOE allocation for by-administration dredging: ₱215,366,000.00
57 dredging projects
2019
Manila Bay Clean-up · GAA MOOE = proposed MOOE
70 dredging projects
2020
GAA MOOE ₱915.0M, the full 100% of proposed
2021
Start of BBB projects: Cagayan, Bicol and Pasig-Marikina · GAA MOOE ₱430.0M, only 43% of proposed
96 dredging projects
2022
GAA MOOE ₱100.0M, only 4.16% of proposed
97 dredging projects
2023
GAA MOOE ₱467.1M, only 21.62% of proposed
116 dredging projects
2024
GAA MOOE ₱434.4M, only 20.15% of proposed
122 dredging projects
2025
GAA MOOE ₱439.9M, only 15.14% of proposed
134 dredging projects
2026
GAA MOOE ₱1.34B, still only 35.15% of proposed
By-administration dredging
Dredging at the river basins
18 Major river basins
38dredging projects
103dredging & support equipment
Principal river basins
33dredging projects
64dredging & support equipment
In all: 71 dredging projects with 167 dredging and support equipment deployed.
Dredging equipment assigned
All major river basins
0units
The 18 major river basins Click one, or type its number (0 = all)
Click a basin or type its number · drag · scroll to zoom
IBRD Loan No. 9251-PH
Philippines Seismic Risk Reduction and Resilience Project
International Bank for Reconstruction and Development (IBRD)
Project development objectives
What the project aims to enhance
Safer public buildings
Seismic resilience of selected public buildings in Metro Manila
A readier DPWH
Stronger capacity to prepare for and respond to emergencies
PSRRRP Component 2
Improving Emergency Preparedness and Response in Public Works
159units of mission-essential equipment
Transport & mobilityRestore roads and access after a disaster
CommunicationKeep field teams connected
Capacity buildingTrain the Department to prepare and respond
Small to big disastersFrom yearly events to rare, high-impact ones
Multiple hazardsClimate-related disasters and public health
Oplan Metro Yakal PlusAnd other national emergency response plans
PSRRRP · Component 2
Emergency response equipment
Click any photo to browse the lots
Lot01
PSRRRP equipment · 1 of 14
Backhoe Loader
Scroll or use the arrow keys to browseClick outside the photos to go back
PSRRRP · Component 2
Where the equipment is stationed
Bulacan 3rd DEOSan Rafael, Bulacan
18
Laguna 2nd DEOLos Baños, Laguna
33
Batangas 3rd DEOTanauan, Batangas
20
BOE Bicutan & PCG Base FarolaTaguig and San Nicolas, Manila
53
Equipment
Bulacan 3rd DEO
Laguna 2nd DEO
Batangas 3rd DEO
Bicutan / Farola
Total
Backhoe Loader
3
6
3
2
14
Hydraulic Excavator, Crawler Type
3
7
3
3
16
Prime Mover w/ Low-bed Trailer, 50 tons
1
1
1
1
4
Prime Mover w/ Low-bed Trailer, 75 tons
0
0
0
2
2
Stake Truck w/ Boom
2
4
2
2
10
Water Tank Truck
1
2
1
2
6
Tow Truck
1
2
1
2
6
Dump Truck
3
7
4
2
16
Bulldozer
0
0
1
15
16
Fuel Tank Truck
1
2
1
2
6
Wheel Loader
0
0
1
7
8
Road Grader
1
0
0
7
8
Mobile Shop Truck
1
1
1
5
8
All Terrain Crane
1
1
1
1
4
Total
18
33
20
53
124
EV integration · executive summary
Why the BOE is going electric
The law we are complying with
Republic Act No. 11697
Electric Vehicle Industry Development Act (EVIDA) · lapsed into law on April 15, 2022
Its declared policy (Sec. 2): reduce the country's reliance on imported fuel for transport, and promote cleaner, low-emission vehicles.
5%of the fleet
Section 16
Government fleets must go EV
National agencies, GOCCs and LGUs must make at least 5% of their fleet, owned or leased, electric, on the CREVI timeline: by 2034, per the DOE.
PBBM target (Apr 2024): 10% of government vehiclesSONA 2026: prioritize EVs in re-fleeting
DPWH task
Section 12
DPWH writes the charging rules
The DPWH must set guidelines for installing charging stations in buildings and other establishments.
✓ Started: DO 135 & DO 136, s. 2025 (charger specs and EVCS guidelines)
5%of parking
Section 17
EV parking in buildings
New public and private buildings with 20 or more parking slots must set aside at least 5% for EVs.
EV a vehicle run fully or partly on electricityEVCS EV charging stationCREVI the national EV roadmap that sets the deadlines
How we got here
The law sets the target
EVIDA requires every government agency, the DPWH included, to electrify at least 5% of its fleet.
DPWH has a double role
It must comply as an agency with a large fleet, and lead as the agency that writes the charging station guidelines.
The BOE takes it on
As the equipment arm managing all DPWH equipment assets, the BOE plans the EV fleet: 103 electric and hybrid vehicles endorsed to DBM for 2024 and 95 for 2025.
EVs need places to charge
So the BOE built the charging program: DO 135 and DO 136, s. 2025, and ₱300 million for 300 charger sets in 18 offices.
The payoff
Less fuel bought, cleaner air around our offices, and a DPWH fleet ready for the EVIDA deadlines.
EV integration
Electric vehicle roadmap
1st Q 2025
Research and Preparation
Policy research, technical validation and preparatory consultations to lay the foundation of the Electric Vehicle Charging Equipment (EVCE) Program.
2nd Q 2025
Issuance of Policies
DO No. 135, s. 2025: DPWH Standard Specification for Item 1112, Electric Vehicle Charging Equipment. DO No. 136, s. 2025: Guidelines for the Construction of EV Charging Stations (EVCS).
3rd Q 2025
Fund Distribution
₱300 million released for distribution to all DPWH Regional Offices, approved through a memorandum dated August 1, 2025.
4th Q 2025 onwards
Project Implementation
Regional Offices start EVCS construction: procurement, site preparation, and compliance monitoring under the issued guidelines.
EV integration
Three types of charging equipment
Direct current
60 kW
162sets
Max. current
200 A
Min. rated power
60 kW
Voltage range
200 V – 1,000 V
Input voltage
400 V ± 15%, 3 phase / 60 Hz
Connector
CCS Combo 2
Compatibility
EVs with the same charging protocols
Alternating current
22 kW
18sets
Max. current
32 A
Min. rated power
22 kW
Input voltage
400 V ± 10%, 3 phase / 60 Hz
Connector
Type 2
Compatibility
Type 2 to GB/T AC adapter; Type 2 to CCS2 (EV inlet) for AC charging
Alternating current
7 kW
120sets
Max. current
32 A
Min. rated power
7 kW
Input voltage
230 V ± 10%, 1 phase / 60 Hz
Connector
Type 2
Compatibility
Type 2 to GB/T AC adapter; Type 2 to CCS2 (EV inlet) for AC charging
300charging sets in all
₱300Mtotal cost
18DPWH offices covered
EV integration
Charging sets per office
300 sets · ₱300 million
DC 60 kWAC 22 kWAC 7 kW
Central Office and NCR share one allocation of ₱18.9 million.
EV integration · as of June 2025
EVs endorsed to DBM
CY 2024103units endorsed
CY 202595units endorsed
HEV hybridPHEV plug-in hybridBEV battery electric
Section
Other Endeavors of the Bureau of Equipment
Beyond our regular programs, the BOE fleet and crews step in when the country needs them.
4endeavors
2019
Manila Bay Rehabilitation
Mechanized cleanup of the bay
2020
Taal Volcano Eruption
Clearing ash so help could come in
2026
Malabon–Navotas Landfill Fire
Covering the fire with soil
Since 2019
Free Bus Rides
Health workers, ASEAN delegates and stranded commuters
Other endeavors of the Bureau of Equipment
Manila Bay Rehabilitation2019
The "Battle for Manila Bay"
Launched on January 27, 2019 to clean up the bay, with the DENR leading the agencies the Supreme Court tasked to restore it. The DPWH, through the BOE, ran the mechanized cleanup using its own equipment.
28heavy equipment units deployedamphibious excavators, dump trucks and a debris segregator
1.5 kmof shoreline cleanedManila Yacht Club to the U.S. Embassy
225,000m³ of silt and garbagetargeted for removal
16hrsof work a daysix days a week, plus a night shift to haul to the landfill
Jan 27, 2019Cleanup launched
Mar 5, 2019DPWH dredging starts
Mar 2019Night shift added
Other endeavors of the Bureau of Equipment
Taal Volcano Eruption Response2020
What happened
Taal Volcano erupted on January 12, 2020. Alert Level 4 was raised that night, and thick ash buried the roads of Batangas and Cavite. Under Oplan Taal, the DPWH sent in its equipment and crews.
4Alert Level raised by PHIVOLCS
70,413people in evacuation centers
How we responded
Graders scraped ash and debris off the roads to make room so public services could come in
Dump and stake trucks carried residents out of the danger zone
DPWH crews shoveled ash so ambulances and relief trucks could pass
Other endeavors of the Bureau of Equipment
Malabon–Navotas Landfill Fire2026
What happened
On April 10, 2026, a fire broke out at the Navotas sanitary landfill. Its smoke made the air hazardous across Metro Manila and Bulacan. On the President's instruction, the DPWH sent in its heavy equipment to cover the fire with soil.
30days until the fire was declared out
28.6haburned, about 71% of the landfill
How we covered the fire
Dump trucks haul in soil and sand
Bulldozers and excavators spread it over burning sections, level by level
The soil cuts off oxygen, so the fire dies out
Apr 10Fire breaks out
Apr 12Declared under control by the BFP
Apr 16DPWH equipment deployed
Apr 29About half covered
May 6About 80% contained
May 10Fire fully out
Other endeavors of the Bureau of Equipment
Free bus rides when people needed them most
2019
30th Southeast Asian Games
For ASEAN delegates
When the Philippines hosted the 2019 SEA Games, led by Alan Peter Cayetano's organizing committee, our buses ferried athletes and delegates from across ASEAN.
2020
COVID-19 pandemic
For hospital workers
When public transport stopped during the lockdown, the DPWH Free Bus Ride Program took health workers to and from their hospitals at no cost.
Strike days
Jeepney transport strikes
For stranded commuters
When jeepney drivers went on strike, our buses gave free rides to the riding public left without a way to get to work or school.
Regular days
Everyday shuttle service
For DPWH employees
On regular working days, our buses provide transportation for employees within NCR, to and from the office.
When regular transport cannot run, the BOE fleet steps in so people can still get where they need to go.
Organizational challenges
Human resource challenges
No hazard payOur 263 job order workers carry the risk without the pay
Same plantilla, more work86 positions while projects grew from 40 to 134 a year
Hiring bansPositions stay unfilled though equipment works all year
Skills that walk awayShort contracts: trained operators leave
Limited resources
Not enough to runAbout ₱1.81M per unit a year, for everything
Repairs come firstOnly about a fifth of maintenance is preventive
Units waiting on funds46 of 68 idle units wait for funds or procurement
After disastersRecovery work stretches the funds even more
Human resource challenges
No hazard pay for job order workers
Floods
Landslides on mountain roads
263contract-of-service and job order workers carry most of the Bureau's field work
Floods, landslides & disaster zonesare where they operate our equipment
₱0hazard pay on their payslip for that risk
Human resource challenges
More work, the same people
By-administration dredging projects per year
Bigger fleet, same plantilla
The fleet and the yearly dredging program keep growing, but the plantilla stays at 86 positions. Most of the work falls on contract workers.
Hiring bans, nonstop deployment
Bans on hiring stop us from filling positions, even though our equipment is deployed all year round.
Skills that walk away
Short contracts mean trained operators leave, and it takes years to build the skills these machines need.
134projects in 2025, 3.4× the 40 in 2014
86authorized plantilla positions for the whole Bureau
263contract-of-service and job order workers fill the gap
Limited resources
Where a dredging peso goes
Where it starts
Dredging fund
The yearly budget (MOOE) for by-administration dredging
Maintenance
Keeps the equipment working
Operation
Makes the equipment dredge
Preventive
Scheduled care: oil, filters, greasing and inspections, so parts don't break
Corrective (repairs)
Fixing what already broke: engines, pumps, pontoons and parts
Fuel
Diesel for the engines and pumps; the biggest running cost of a dredger
Labor
Operators, mechanics and crew who run the machines every day
Dredging MOOE (example)₱400Mfor all by-administration dredging
÷ 17 regions₱23.5Mper region per year
÷ 221 dredging units₱1.81Mper unit per year, for everything
Maintenance
about 40% · ₱0.72M per unit
Preventive · about 20%₱0.14M
Oil changes, filters, greasing, inspections
Corrective (repairs) · about 80%₱0.58M
Breakdowns, engine and pontoon repairs, parts
₱0 on repairs49%
Repairs (CM)₱0.58M
Left for operation₱1.09M
Operation
about 60% · ₱1.09M per unit
5.5months of dredging out of a 10-month season
Salaries · 12 months₱0
Left for fuel₱1.09M
Fuel per month₱0.20M
In plain words
Every dredging peso is split two ways: one part keeps the machines working, the other makes them dredge. If repairs eat the budget first, there is little left for fuel and crew.
The result
Almost nothing goes to operation
A full 10-month season of fuel alone (₱1.99M) costs more than a unit’s whole yearly share (₱1.81M). Units sit idle, waiting for fuel, repairs or both.
Resiltation
Silt flows back every rainy season, so the same rivers must be dredged again each year.
Bureaucratic delays
Buying fuel and spare parts takes months, which shortens the working season even more.
Example only. Ratios: fuel ≈30% and repairs ≈20% of dredging costs (Bray et al.); preventive ≈10–30% of maintenance (TRB). Fuel: about 16 L/hr for a 20–22 t amphibious excavator digging at high load (amphibious 21–25 t carrier spec: 16–18 L/hr; 20 t excavators: 12–19 L/hr) × 6 hrs a day × 22 days = 132 hrs a month; diesel at the Oct 2026 common price (₱94.40/L). Pay per worker is an example; adjust the sliders.
Limited resources
Our yearly dredging budget, in context
By-administration dredging budget per year
₱400M example
₱33.3M2018
₱215.0M2019
₱915.0M2020
₱430.0M2021
₱100.0M2022
₱467.1M2023
₱434.4M2024
₱439.9M2025
₱1.34B2026
In the last three full years, the dredging budget stayed between ₱434M and ₱467M, close to the ₱400M example.
DPWH flood control fund vs our dredging budget
2024
Flood control₱244.5B
Dredging₱434.4M
Share0.18%
2025
Flood control₱254.3B
Dredging₱439.9M
Share0.17%
Less than ₱2of every ₱1,000 for flood control went to by-administration dredging
DredgingRest of the flood control fund
Flood control: DPWH Flood Management Program, 2024 and 2025 (DPWH data via SunStar, July 2025). Counting all sources, Sen. Lacson cites ₱346.8B (2024) and ₱372.8B (2025), which makes the dredging share even smaller.
How we move forward
01Higher productivity
Stronger equipment repair
Enough funds, spare parts and mechanics for repairs, so broken units get back to work sooner.
Fast-track repair of our 504 non‑operational units
A dedicated repair fund and parts stock per region
Preventive maintenance so small faults never become breakdowns
02Smarter decisions
Digitalization, telematics & ethical AI
Know where every unit is, how it is running and what it needs, with AI that is used responsibly.
One digital database for fleet records, replacing paper forms
Telematics: trackers that report location, engine hours and fuel
Ethical AI spots breakdowns early, with human review and data privacy
03Fair & safe work
Support for our people
Support our operators, mechanics and crews through ethical labor practices: fair pay, safe work, fair treatment.
Hazard pay and benefits, including our 263 job order workers
Safety gear, insurance and reasonable hours in the field
Training and certification with TESDA and other agencies
04Wider reach
Stronger collaboration
Work closely with sectoral partners: other agencies, LGUs, the private sector and academe.
PAGASA and weather agencies: deploy before storms hit
Joint disaster response with LGUs, OCD and BFP, as in Taal and Navotas
Shared data and resources with academe and industry through MOAs
The Management of the Bureau of Equipment
Bureau of Equipment
2nd Street, Port Area, Manila
(02) 5304-3698
Toribio Noel L. IlaoDirector IV0998-950-6560
Hugh Van Erik Q. TolentinoDirector III0915-324-9763
Wilfredo Arthur C. DelizoEngineer V · Chief, EPD0960-456-3170
Virgilio G. RañoaEngineer V · Chief, EOMD0916-902-3959
Francis L. NuñezEngineer IV · OIC, FED0977-255-0240
The End
Thank You! Salamat po!
Bureau of Equipment · Department of Public Works and Highways